My Blog List

Tuesday, August 8, 2017

The Culture Of Demand Chapter 1. The Airplane Industry Has Changed

"The Culture Of Demand", sounds like a book title but its what happening to the aviation industry. The “that’s the way we’ve always done it” is rapidly shifting to just-in-time fleet changing. The airplane culture had the Jumbo Jets spanning the globe during the 70’s through 2010 for forty years without a pause. The airplane culture said going from Australia to Los Angeles is a job for the 747. It also said going Euro via New York required a 757. The airline culture was set on its own status quot.

However, there is a change coming signaled by the President Of The US own proclamation, “The 747 is way too expensive”, until two mothballed 747-8’s were found in California for Presidential purchase. 

Trans Aero did not take delivery of its two 747’s ordered and the Air Force found two brand new ones sitting in California with Boeing. The culture was shifting from the 747.

Then there was the 787 saga of medium wide-body flying the world. 

A 737 NG could only carry 187 passengers going ocean hopping and 240 passengers or more with twin engine 787's.

The airplane culture said no more four (engines). Twins are the apropos style today as a 409 passenger twin is proposed from the 777-9X type. The airplane culture may yet demand a 777-10X twin going 450 seats, thus eliminating any four engine A380 ticket holders. The Pan Am clipper was a dying breed never to be seen again as it landed in New York Harbor from the 1930's.


It Had four engines too!
Image result for Pan Am Clipper

It also had lie flat seating as well with its "Compartments"

pan-am-5

The age of Art Deco passed when WWII came and went. However, the culture keeps churning forward and its demand walks hand in hand as each aviation option plays out. 

Currently, the aviation prognosticators see a different day coming, but it waits for the aviation culture to catch-up on that day. The market must figure out how the "new airplanes" will fit in and offer public options of travel before the culture can settle in with the Jumbo twin engines and super efficient single aisle aircraft. 

The problem comes from the airline top of the organizational tree. They talk of 30" pitch as some kind of standard. Next comes the executive clowns who figure out how to stand passengers up like beef on a hook at a slaughter house. The execs may even suggest its the best way to travel "you'll love it", in an attempt at changing the airline culture into becoming a side of passenger beef.

Somewhere along the marketing supply and demand class an instructor read a book called the "Field of Dreams". "Build it and they will come", was a multiple choice answer. The MBA now working for an airline said, he/she learned it at school during the board of director's presentation class. Mutual clapping was heard from down the hall by those living in cubes. The Administrative assistant heard back slapping from behind the closed door meeting room.

New airplanes are built for the bottom line and not the passenger's bottom. They have departed from the classic mission of building it wonderfully and success will be the results. The new mission is no longer a passenger centered concept but a freight centered operation. The people buying tickets are too fat and they won't cooperate with freight packaging constraints. If Boeing could build a single aisle that could fly cord wood 5,000 miles they would. The airlines haven't figure out how to convince its customers that cord wood seating is a good thing. They are now exploring a way to charge extra for a personally sized meat hook. 

Yes, the culture is not coming from demand but is coming from profit makers. It has become a culture of profit. Long live the "Clipper".

Friday, August 4, 2017

Boeing's Flying X-32 Pig

Boeing military needs a “Game Changer”. Whether it’s a fighter jet, a drone or autonomous war bird, it needs to make a statement war fighter. Its last chance was the F-35 contest which it lost to Lockheed in an ugly fashion that only a US Marine could have loved. Was Boeing just seeking a participation award from the DoD with its rendering of its flying pig?

Image result for X-32

How in the heck could that make a radar profile the size of a fishing boat like the 700 ft.USS Zumwalt had accomplished? It's smaller than a fishing boat without fishing nets. That's how! Was Boeing really trying with this offering or was it a rubber option for making Lockheed's F-35 take the award and without the appearance of Boeing taking a fall in the first round of the fight.

So it went Mach 1.6 and the vertical lift system was not perfected during the competitive test. It once was to co-star in a comedy war movie about a hover tank. The hover tank made it past the DoD generals who approved it and the audience laughed. The X-32 didn't make the movie. The cardboard tank did in its place. 



The X-32 would scare the crap out of frozen soldiers in fox holes. It could lay down fire suppression in an impressive fashion. The flying box was so stealthy it fooled a barn door into thinking it was a brick wall. Boeing was proud of its 1960's delta wing style and it did lose to the F-35 on style points. 

The advice given Boeing was to stop having staff meeting for any new idea or it may end up with another X-32. It certainly was a staff meeting concept put together with copious amounts of coffee and donuts. The same team assembled an elephant for the run for the roses at the derby.

The Defense department wanted a Multi-role fighter that could take-off vertical, go Mach 1.6 and be invisible to radar. The the DoD wanting an air frame space large enough to stuff technology into it that would beat any future war scenario. 

Boeing took the DoD seriously and showed them this picture. The DoD met afterwards and gave a sigh of relieve having Boeing's X-32 in the competition. It could ease back and justify it's a competition after-all, and the award would go to Lockheed without question. Boeing would make money also on this deal for taking a powder.

Many a pundit said something is wrong with this picture, it just doesn't look like a fighter nor can it do all mission roles required. It didn't matter since it was not the choice anyways from the start of this Multi-role fighter saga. At the time of the awarding, Lockheed was no longer a competitor, and it did not have to act as the competition. 

In American enterprise it is said, "Competition makes the best product". The Lockheed offering stopped being competitive over 10 years ago. It just had to please the Hover Tank Gang lead by Sargent Bilko at the DoD. The new jet competition is between who can do what to whom for the most amount of money. 

I do believe, by accident, the F-35 will turn out just fine for the best money can buy results, which has become the true American culture. No longer does competition make diamonds because doing it that way only costs time and money, huh?

Wednesday, August 2, 2017

Where Will Boeing Get Its Next Cash?

This is another big and broad topic. Boeing regularly reports cash inflows and a prop to its stock price going higher. Nothing is forever and Boeing knows this and has some kind of plan for its future cash infusions.

This all starts with will future sales and its completions of sales contracts. This cycle is probable but has some risk in it such as Boeing's recent Transaero order book adjustment which will show up in the July Boeing reports. The blog is about the June reporting numbers of Boeing's backlog by unit and list price. The backlog/price is Boeing's fuel for future performance and stock appreciation.

Below is a snapshot of Boeing's undelivered units and its associated list prices ending June 30th 2017. An addendum WI report for July will show all updates per Boeing web reporting.



What the chart estimates is a cash backlog from undelivered units with a value of $831.5 Billion. This is  a fluid and dynamic number where month to month can change dramatically. The change is often surprising,  as production remains somewhat stable. The backlog cash value can change from the back end as orders are cancelled and recognized by Boeing accounting. The front end is its production stream with its deliveries.

Using the analogy of a fuel tank on a automobile shows the concept best. A full tank of fuel can take the company a long way while pleasing its passengers , the stockholder. Sometimes vehicles has dual or spare fuel tanks. The 737 program is Boeing's main tank and the wide body programs are under a half a tank as a dual tank, which will take the Boeing Corporation only so far into the future.

The 737 program represent 58% of its future cash flow.

Per Type Cash Backlog as a percentage:

  • 737 58%
  • 747  1%
  • 767  2%
  • 777  20%
  • 787  19%

Total 100% of 832 Billion


As can be derived, the single aisle program (737) is the critical piece to Boeing's aspirations going forward. Boeing hopes to change the balance where the wide body will share a potential cash value with the single aisle program. Using above numbers the 58% single aisle cash backlog of the total 832 billion is compared with the 42% for the wide body contribution of its cash flows.

Contract price is about 50-55% of list price as Boeing offers package deals for its preferred customers who have bought Boeing products over time. Therefore, it is a solid estimate for Boeing's backlog cash amounting to somewhere in the $425-$460 Billion range.

A Boeing goal would be to continue a robust sales campaign for its varied wide body fleet. The per unit price for wide bodies has an immediate impact of its cash backlog. 

The 747 program has died. 

The 767 program is on freight life support. 

The 777 program is caught in the door of transition from 777-300ER going to 777X. The backlog of older 777 has a reduced production flow since it is running out of 777-300-ER's to build and the 777X hasn't been assembled. So the 777 cash potential will increase as a cash reserve, but diminish as a cash flow during the next two years. 

Boeing will have to rely on its 737 program for cash flows during the next two years until the 777X entry into market.

The 787 wide body program is the secret Boeing sauce. The 787-10 is a cow tipping point of cash for Boeing. More orders for this type are coming and more cash from this type will emerge. Its too early to tell what the 787 program will do by year's end, but it may surprise the financial prognosticators by year's end.   Boeing has the same general numbers this blog has obtained from Boeing's own website.

Therefore, its emphasis is to bring a high amount of backlog and a balance with its various commercial programs. The sales campaigns are not for public view and are actively going forward. Boeing is attacking its future while burying its dead along the way. A sad farewell for the 747 is happening while a robust 777X project is emerging as its latest star in the making. A future cash flow is forming in 2017 and 2018. It is shown through a MAX effort for the 787-10 and the 777-9X. The marketing team is keeping pace with its production counterparts.

Tuesday, August 1, 2017

Sheikh Ahmed Makes Boeing Sweat Bullets With Emirates Order

It has been a long wait for Emirates, Sheikh Ahmed to announce a mega deal for its airline. Background on the Emirates deal making can lend some insight but not a definitive outline who the Sheikh may deal out the wide body order.

Some history with Emirates and Airbus exist which makes it an interesting decision path. 


During June 2014, Emirates dropped the shoe on Airbus and canceled its entire 70 A350-900 order. It amounted a $21.6 billion Airbus embarrassment. After all, Emirates was a leading A-380 customer at this time. It has introduced 95 A-380's into its fleet with a remaining 47 Airbus A-380's on order. Emirates has a big Airbus interest muted by the A350 cancellation in 2014. The conclusion is a slight Airbus advantage before considering a waning super jumbo market dying.

Boeing, was a lady left at the order alter throughout Airbus' march into the UAE and has had a lot of time and change management on its hands since the first A-380 delivered. Boeing has since amassed 150 Boeing 777X orders, Thirty-five 777-8X and 115 777-9X. Similarly it has 139 777 classics in its fleet where the retirement for the 777 classics could coincide with its inducting its 777X order book. The 777X orders came after the Emirates A-350 cancellations. The conclusion is a significant Boeing advantage since Emirates is renewing its Boeing wide body fleet with the 777X.

The current order target is for the mid-wide body class. Emirates already passed on 70 A-350's it had locked down. Winging It assumes it was because the 777X was announced earlier and after Emirates' input regarding the design, range and 777X efficiency. 

Emirates wasn't ready for the 70 A350 it had ordered since the 777-300-ER was providing Boeing air cover for Emirates fleet requirements. It had so many A-380's on order, so cancel A-350's they did! The ordering has opened up again as the Emirate's fleet plans have matured to the point it can slot in either the A-350 or the 787 during the next 10 years. However, the A-380 is slowly turning into a Emirates white elephant causing a fleet strategy change, by using the 777X orders in its place as they retire its super Jumbo fleet over time. A note from Emirates to Airbus, "We don't want no stinking A-380 NEO". A second note from Boeing, "we rented space next to you at the Dubai Air Show". November is end of year-ish as the Sheikh could announce a mega order during the year's last quarter and still be spot on when he just announced it will be the end of the year for a wide body announcement. Enough of the announcements in one sentence.

Several have reported the deal is done and Boeing won, which makes sense when looking at fleet numbers and the A-380 descent in the market place. The A-350 is matched by the 787 at several levels. Perhaps Emirates doesn't need a 8,000 mile traveler with high density appointments. It may only need a high density traveler closer to home reaching Europe and the East as far as Perth Australia. A step up would be a 777-8X for "all" the far east destinations. Having a 787-9 order would fill any intercontinental requirements without it having to fill an A-380 with five hundred passengers. Once again the 777-9X 400 seat lay out would replace any half-filled A-380 route. The fleet combination of 787's and 777X's is a more deadly competitor than having a A350 fleet with an ailing A-380 as its stable mate. Emirates is looking for the right mixture for its fleet. Since the launch of the A-380, a lot has changed and Boeing got the memo to change and change they did. Boeing is looking down the barrel of an immense Dubai order this November as the Sheikh has indicated.


Monday, July 31, 2017

Added Value A Boeing Target

Boeing has for a long time avoided making things without wings such as avionics suites or even engines. The later mention of engines is far from a Boeing thought cycle but it has an eye for other stuff that Rockwell Collins and and Honeywell International may supply. A bold step is adding on other things to a portfolio when making high tech things like airplanes. Boeing makes military, space and other X projects too. It isn't hard to imagine them making avionics for example for its own aircraft and for others.

The manufacturer has a think tank exploring all kinds of ways it could add value to its product line. If it could make its own flight controls, or make  engines then Boeing would add value to every aircraft it sells.

It Sounds Like A 787-300 To Me

Quote coming from: 

".. [W]e see route structures around the world continuing to evolve as general passenger traffic growth is occurring, in particular, new regional structures, point-to-point connectivity. That's in this 4,000 to 5,000 nautical mile range, airplanes that are in the 220 to 270 passenger range. That's the ballpark that we're looking at and discussing with customers."
-- Dennis Muilenberg

Boeing is going big with a NMA offering. The decision to build a NMA tween the 787 and the 737 has caved into other considerations such as:

Plant expansion and space availability.Technological fall forwards from prior programsRange announcement of 4,000-5,000 milesSeat Announcement from 220-270 units.Mature supply sources in place.
Boeing already has the infrastructure to build more 787 and does not have as much 737 site capacity for a NMA. It has a process in place for building all CFRP aircraft from its two sites in Everett, Wa and Charleston, SC. In fact, Charleston has more available acreage for plant expansion than Everett has on its books. In SC Boeing can buy more land where in Everett the land around its manufacturing footprint becomes more expensive and in shorter supply.

Boeing can't use all its hard gained technology in a NMA metal frame concept. The NMA is ripe for everything Dreamed of over the last 15 years and it will go CFRP on wings and body. In addition, the body design will change to an unconventional shape which is  perfect for CRFP shaping. Using older 737 Max building technology limits any future following advancements for a new type.

The former 787-300 range was set at about 3,300 miles. What Boeing has learned it can build a lighter frame going 4,000 to 5,000 miles on new technology engines. Additionally, it can connect 787 technology to a NMA better than connect the 737 Max technology going forward. Weight saving "All electric architecture" may be a selling point on the NMA. A core operating system from the 787 is more inline for a NMA than using a Max type system for a NMA.

The announced seat capacity of 220-270 suggest a dual aisle - 8 across profile. Something like a 2-4-2 would get Boeing to 220-270 passengers in a two class cabin or less. The eight across would alter the 787 hull diameter by a small increment, thus allowing NMA sections to be moved by the Dream Lifter. 

In fact Boeing has access to an abundance of 747's on the used market where it can expand its Dream Lifter Fleet by several without immense costs incurred. Charleston could build the NMA and 787-10 exclusively. Everett on the other hand would build the 787-8 and 787-9 exclusively.

Finally, the supply line would not be disrupted having only a few modifications to its requirements. A hull and wing building source would have to be identified. The engine maker may go to "the winner takes all", when awarding to only one engine maker, like the 737 has used over its years. 

The competition would be fierce among the Builders. GE, CFN, PW and Rolls are the names of the big players. Engine supplier competition is a fortunate problem offering builders a chance at a whole new engine type unlike any other. A locked in exclusive contract is what stock market values are all about. The NMA could sell 2,000 units in the first five years. This may disrupt both the single and dual aisle current stability at this time. Boeing is betting it will hurt Airbus as a whole, more than its Boeing family of aircraft.

Saturday, July 29, 2017

The 787 Marches On With July Numbers

Boeing has had a solid July 2017 with its deliveries of 12 787, completing a 90 day run of 36 of its type delivered. The program as depicted in the first chart showing only at a -1 backlog change for the year , indicating a production increase to fourteen monthly units is possible. Boeing already knows what orders will unfold in the next five months. Having a twelve a month pace for the last 90 days and during the 787-10 first test copies flying, suggests preparation for 14 a month delivery pace is an already a planned production change for 2018.

Fig. 1


In figure 2 below the 12 a month delivery schedule is on track.

Fig. 2


Fig. 3 The tracker indicates 2017 a robust 787 year.

Fig. 4 Program history to date.

Fig. 5 Program 787 model balance for delivery and orders.

Thursday, July 27, 2017

Boeing Cash Drives Its Stock

A Movie actor has its time in the fame. It seems like a movie made by an certain actor becomes successful no matter the theme. It also seems the actor's run at stardom will never end. Then without any kind announcement the star actor fades almost over night. Nobody really know why this phenomenon occurs. I remember back ten years ago when Julia Roberts made a movie she made $20 million and was the highest paid female actor in the business. She was a cash kind of person. Her stock in movie making was the highest. But what happened? Julia no longer pushes out movies every year but remains a much loved actor by all kinds of movie goers.

Boeing is a cash kind of entity, will they repeat the profile of a superstar and fade as fast as it comes onto the scene? Fortunately a business is the kind of entity that must reinvent itself every so many times it comes to market. Julia Roberts can't control the scripts offered nor her age changing the audience appeal. Boeing too can control what it is and appeal to an ever fickle aviation audience. Thus bringing back a full circle of cash driving Boeing stock valuation.

Boeing's second quarter 2017 just reported the best quarter since 2009. Its stock value is driven by cash infusions from sales. The definition of a Boeing sale is an airplane delivered and does not reflect an airplane ordered. Going back to production numbers becomes a critical determiner for cash flows. The mix of product delivered is the the secret of Boeing's cash. If producing and delivering less aircraft than last year an entity would expect a lower cash receipt account. Boeing played some tricks on the way to the bank. It delivered aircraft which made more money when recognizing a lower cash received  trend  based on units delivered.

CNBC Quotes:

"Monster cash flow," said analyst Robert Stallard at Vertical Research. The results were "about as close to perfect as it gets from Boeing," he added."

"Boeing has cut spending aggressively by streamlining production, reducing payrolls and winding down development costs. Its 787 Dreamliner contributed about $530 million in cash in the quarter."


If repeating a 1/2 billion cash quarter every quarter, it won't be long before Boeing pays back all its developmental markers enough to reinvent itself again.


Boeing refuses to be a retiring starlet, It's in it to win it!

The trend line has an arrow tip pointing right at a NMA type. The ducks on lake Washington are lined up in a row. Research the market, find launch customers, and find cash to build it. Boeing hired a administrative assistant only to make check marks on its lists of things-to-do which is finally checked-off after the recent 2nd quarter reports.


Since Boeing has controlled its production costs and has an over abundant backlog of aircraft on order, Its a matter of executing its plan without interruption. This only takes time and the outlook ahead says Boeing has already stocked up enough time to improve all its production metrics. The 787-10 is a matter of time as is the 777X. Boeing has learned how to complete a plan as it had learn with the 787 program. The Max program is the symbol of completeness for its single aisle offering. Its competitor in that division has a major engine nightmare. Boeing took its lesson many years ago when it found CFM to do the job with immense reliability for the 737 program. Now Airbus has stalled its big idea for two engines choices for its A320 NEO. The P&W gear driven engine is in some refinement trouble and backs the Airbus delivery goals off a bit thus strangling its cash flows opposite of what Boeing enjoys at this time.

Wednesday, July 26, 2017

Almost a 1,000 days later Airbus delivers 100th A350

One metric is aircraft production. In the same amount of time for producing wide bodied aircraft the question remains what is the difference between Airbus' A350 and Boeing's 787?

Here is the raw data based on Airbus 100th A350 delivered today July 27, 2017, which happens to mark 955 days later from its 1st A350 delivery.

What did Boeing do with its first 955 days from the 787's first delivery?




Last year, March 2016, was a Winging It blog
which illustrated where the two programs were at about 500 days out from first delivery. Boeing had the lead with 50 787's and Airbus with 16 A350's in about the same amount of production time. Boeing's production margin in 2016 was 34 units ahead of Airbus during the same length of time in days comparing both productions effort. However, Airbus has since picked of the pace as it delivered its 100th A350 today, July 27, 2017. It now lags Boeing by 41 units built during its first 955 production days. Airbus only lost ground in the last production period since March 2016 by 7 units. Boeing produced 141 of its 787 in the same number of days Airbus had when it reached its 100th A350 delivered today.

Tuesday, July 25, 2017

Implied, Boeing 787 Deferred Costs Have Run Out Of 787's (Updated)

A complex subject indeed. A blog is no match for the topic of Boeing's deferred costs from its 787 program. The first point is defining what the beast is and the second is how much has the beast devoured of Boeing's profit margin. Finally, Bloomberg wrestled the topic in 2016.

During 2016 Bloomberg estimated that Boeing moved a total of $32 billion loss into an accounting pit which would not affect its annual profit loss statement. In essence, the $32 billion Boeing spent on its 787 program is set aside as a deferred cost to reach a zero balance at a future date. Boeing says, "when the 1300th 787 is delivered". Currently Boeing stands at 575 787 delivered. It has booked 1,275 787's. Boeing has estimated it will pay for the program by the 1,300th 787. It should exceed 1,300 orders by year end 2017. But most certainly reach the sales goal during 2018 without concern.

Therefore 1,300 delivered 787's minus the 575 already delivered gives Boeing about 725 units to pay off the remaining estimated $27 billion deferred costs. The $27 Billion is a debated number which would take another thousand pages of technical text book writing to nail it down. So an estimated $27 Billion deferred cost number is for Boeing to explain to investors.

Boeing started making money on each delivered 787 during 2016 and has since profited a little for each 787 delivered since that recognition of per unit profit. Unit profit is not a program accounting element. However, going from $32 Billion down to $27 Billion deferred costs is a $5 billion reduction of that type of cost.

What is the deferred cost beast? The accounting theory takes a journey from 787 program inception to eventual profitability. Accounting does not match a delivery with the programs total debt at the time of each delivery. Unit Accounting Example; If Boeing had spent $10 Billion getting to its first units delivery then the first unit would recognize a $10 billion loss at delivery. As the program goes forward with real time delivery, it also incurs additional R&D costs during the program's journey. In March of 2016 Bloomberg asserts a $32 billion cost hole, but Boeing had already delivered about 400 787's when the deferred cost account topped out at with Bloomberg's estimated total. 

Defining the deferred costs beast comes from program accounting theory. The program someday will deliver 1,300 787's at which time will have paid off all cost set aside on its books. Boeing looks at the over-arching accounting block of the program and not a unit by unit chiseling away of debt with each 787 delivered. Program accounting does not know at any given time what additional cost may arise, but does know with some certainty when a program matures to profitability.

Winging It 787 program status March 2017:

The units Boeing has yet to deliver going forward must contribute with each delivery towards a reduction of debt and Boeing bets it will do so by unit 1,300.

The $32 billion dollar hole has shrunk by $5 billion with its last 175 787's delivered. This indicates for every one 787 delivered it reduces the deferred cost amount by about $28 million per unit. With 725 units expected in the its current accounting block that pace suggests Boeing can reduce about another $20 billion of its $27 billion money pit when it reaches its 1,300th delivered.

Boeing has other ways of reducing its programmed deferred cost. It is making more money per unit over-all than last year profit making metric. 

Additionally, the 787-10 will contribute a lot more profit dollars per unit than the 787-8 or the 787-9. 

Finally, Boeing has taken an aggressive production cost reduction on plant assembly through efficiency, which allows a smaller cost for each unit delivered. 

This is an ongoing Boeing production efficiency program with no ending during the 787's production lifetime. Boeing hopes to increase its per plane profit from $28 million upward to $37 million per unit from this day forward. Boeing needs to find an additional $9 million per unit in order to meet its block accounting goal of 1,300 units.

Boeing doesn't reveal airplane prices during a sale and it is estimated the average sales prices is 51% of actual list price. It is much like a window sticker price on a new car. Nobody pays sticker. The Airline industry does not pay a list price. 

Before break-even analysis can be reported, the variable and fixed costs are identified per unit delivered. Boeing has not publicized its cloudy trail of costing for the 787 program. That is needed for further analysis in order to isolate its contribution margin per unit. How much does each unit's profit contribute during the length of time during its program? 

Boeing set the length of time by 1300 units delivered where its program debt will be extinguished. The 1,300 unit block is not a break-even even point. The program debt set aside as deferred cost becomes a program pacing method as costs are added and production efficiency value reduces its debt-set-aside during the program execution. The 1,300th unit is an estimation from out of its production of an intersection as a zero balance is achieved with its deferred cost account. 

Points to Ponder:


  • On-going production costs are part of break-even analysis.
  • A per unit profitability is a source for paying down any Boeing liability.
  • Unit profitability is a margin between sales price and production unit costs (using variable and fixed cost accounting).
  • Deferred Costs reduction is a "use" identified when "sourcing" production profits for its reduction.